New  driveways constructed by Acer Property Services

The most important part of any base or driveway is the form work, and the sub base.

Poor preparation will lead to short term life expectancy.

 Drive 1 cowburn

 A drive or base can be plain concrete, or have the perimeter finished with edging blocks etc. 

drive 2 cowburn

 


  A simple increase in drive area can also be created by constructing a sound base and edge then spreading shale or coloured stone.

 

Lock for web 1